2020 E-Z Drill Inc. Two-Gang Drills 210B-2 Horizontal

2020 E-Z Drill Inc. Two-Gang Drills 210B-2 Horizontal

Swipe to View More

  • Year 2020
  • Make E-Z Drill Inc.
  • Model Two-Gang Drills
2020 E-Z Drill Inc. Two-Gang Drills 210B-2 Horizontal

2020 E-Z Drill Inc. Two-Gang Drills 210B-2 Horizontal

2020 E-Z Drill Inc. Two-Gang Drills 210B-2 Horizontal

The 210B-2 drill operates from the subgrade and features two drill systems, making it an economical option that delivers greater efficiency on straight-line projects such as lane additions and airports.

Operational

Operating Conditions Air Consumption (minimum): 200 cfm (5.6 m 3 /min) | Impact: 36 ft. lbs. (49 blow)
Operating Speed Hammer: 2200 bpm | 288 rpm

Hydraulics

Maximum Pressure Operating: 90 psi (6.2 bar)

Dimensions

Dimensions 61 in (154.9 cm) | Drill Distance From Corner: 6 in (15.2 cm) | Drill Distance From Ground: 3 in (7.6 cm) | Drill Bit Diameter: 5/8 in to 2 1/2 in (15.9 mm to 63.5 mm) | Chuck Size (std.): 7/8 in x 3 1/4 in (22.2 mm x 82.6 mm)
Depth, Maximum Drill: 18 in (45.7 cm)
Length Lower: 48 in (121.9 cm) | Lower: 56 in (142.2 cm)
Height 37 in (94.0 cm)

Weights

Weight 710 lbs (322.3 kg) | Drill Motor: 54 lbs (24.5 kg)

Product Photography